Bathroom renovation & fitting

Bathrooms, showers, plumbing, waterproofing, tiling and finishing.

Overview

A bathroom renovation combines preparation, plumbing, waterproofing and fitting in a planned sequence. We assess the room and discuss the layout, sanitary ware and finishes before quoting. The agreed scope identifies what is being removed, retained, moved and installed.

What is included

The final quote confirms which items are included in your project.

  • Strip-out and preparation
  • Plumbing changes
  • Waterproofing
  • Wall and floor preparation
  • Tiling
  • Shower installation
  • Bath installation
  • Toilet and basin installation
  • Flooring
  • Wall and ceiling finishing
  • Ventilation coordination
  • Final inspection and handover

Typical work list

  • Strip-out and preparation
  • Plumbing changes
  • Waterproofing
  • Wall and floor preparation
  • Tiling
  • Shower installation
  • Bath installation
  • Toilet and basin installation
  • Flooring
  • Wall and ceiling finishing
  • Ventilation coordination
  • Final inspection and handover

Who this service is for

Homeowners, apartment owners, landlords and property managers replacing or improving a bathroom.

Project stages & expected timeline

Use the following as a planning sequence, not a guaranteed duration. Any day ranges are illustrative and may overlap.

  1. Illustrative days 1–2

    Strip-out and preparation

    Remove agreed fittings and check the exposed condition.

  2. Illustrative days 2–4

    Plumbing and first-fix

    Prepare pipework and the planned positions for fittings.

  3. Illustrative days 4–6

    Preparation and waterproofing

    Prepare surfaces and allow the selected system to cure.

  4. Illustrative days 6–9

    Tiling and flooring

    Lay finishes and allow appropriate drying time.

  5. Illustrative days 9–11

    Fitting and finishing

    Install sanitary ware and complete agreed finishing work.

  6. Final stage

    Inspection and handover

    Check the work, clean the work area and review the finished room.

Project duration depends on size, condition, materials, access and the final agreed scope of work.

What can affect the timeline

  • Existing condition and hidden damage
  • Final scope, design and material availability
  • Access, occupied rooms and working hours
  • Drying, curing and specialist trade coordination

Preparing for the work

  • Choose fittings and tile sizes before the start date.
  • Tell us about leaks, water pressure or ventilation concerns.
  • Discuss use of another bathroom and access through the home.

Frequently asked questions

Can the bathroom layout change?

Layout changes depend on drainage, pipe routes, structure and space. We assess feasibility before including them in the quote.

Is waterproofing included?

Waterproofing requirements and the specified system are identified in the agreed scope before work starts.

Can I use the bathroom during the work?

A full strip-out normally takes the room out of use. Temporary arrangements should be agreed before scheduling.